Fox Shocks Factory

Gainesville, Georgia

CLIENT
Fox Shocks

SIZE
300,000-SF

SERVICES
Master Planning, Design Services

BRPH provided master planning, architecture and engineering services for a new 300,000-SF fabrication and assembly facility for Fox Shocks in Gainesville, GA. BRPH assisted with the local Economic Development contact to review multiple sites for feasibility and development for Fox’s new HQ relocation from Southern California to NE Georgia. The new facility consists of approximately 176,000 SF of assembly space, 134,000 SF of fabrication space and 37,000 SF of office space.

Tooling includes an anondizing line, CNC machining and lathes. The facility also includes two clean rooms and nine loading docks.