Architecture and Engineering icon

Services

  • Design-Build
  • Architecture
  • Engineering
  • Construction Administration

Awards + Certifications

  •  LEED Gold
  • ABC Eagle Award – National Museum of the U.S. Air Force, Hangar Addition Design-Build Associated Builders and Contractors of Central Florida, 2016
  • U.S. Air Force Design Award- National Museum of the U.S. Air Force, Hangar Addition Design-Build, 2016

U.S. Army Corps of Engineers, Louisville District
Dayton, Ohio

Under a design-build contract with Turner Construction Company, BRPH provided architectural design, engineering, and construction administration services for the National Museum for the U.S. Air Force, Wright Patterson AFB. The work included the design of Hangar 4 for the National Museum of the U.S. Air Force that will house exhibits for the Space Shuttle featuring NASA’s first Crew Compartment Trainer (CCT-1), presidential aircraft, research and development exhibit with the XB-70 and other aerospace vehicles, and global reach aircraft including the C-141 Hanoi Taxi.

The new LEED Gold hangar includes 14 structural bays totaling 169,000 square feet and connects to the Museum’s existing Hall of Missiles. This exhibit space is a clear-span structure with hangar doors on the east and west ends, offering open clearance 170-feet wide by 42-feet high. The new facility matches the existing hangar in materials and finishes, and features features a prefinished insulated seamed metal enclosure that meets the energy requirements for the envelope. Site work included the design for the aircraft taxiway, apron, aircraft parking, and pavement markings.

BRPH provided the BIM management of the contract drawings and document controls for drawings and specifications. Additional services included an extension for additional exhibit bays, west hangar doors, a café and gift shop. Interior design service included finishes, FF&E coordination and SID requirements. BRPH also provided support documentation for the LEED Gold facility certification and supported enhanced commissioning activities. The design was completed in two packages to promote a fast-track schedule that allowed construction to commence in advance of design completion.